the further adventures of

Mike Pirnat

a leaf on the wind

« Previous Post Next Post »

At Long Last

Our half-bath is (essentially) complete, as well as this weekend's repainting and rewiring in the master bedroom! I'm especially proud of having replaced all of the remaining electrical outlets by myself. Minor tasks remaining include:

  • Replace beige switches and outlet in half-bath with white switches and outlet
  • Clean up grout around backsplash in half-bath
  • Replace carpet in master bedroom (to be done by carpet-installer people... I know better than to have any part in that!)
  • Restore art to walls
  • Find art for walls outside of half-bath

View from the hall

The vanity and sink area

The stuffed critters resume their rightful place on the headboard

The mostly-reassembled bedroom, yay!

blog comments powered by Disqus

« Previous Post Next Post »